Interlochen Bathroom
Back to all projects
An update without a full remodel was the aim of this project. The wet room in the primary bath was the focus of the bathroom update.
In the bathroom the tub was in its own enclosure with two additional shower heads in the main wet room. Everything was removed, including the original glass block window. It was important that the structural cross in the original bathroom be preserved, and it was carried out in other design elements of the room. The plumbing fixtures, the tile design, and the window all have cross elements.
A generous soaking tub was placed in front of the new window, while a roomy shower with lighted niche and integrated ledge were built in.
The Journey
Let’s Talk
Request a no-hassle consultation with our team today.